EUISMOD
1,246.96 MW hybrid in Kern, CA · In queue since April 2021 · Proposed COD June 2028
1,246.96 MW
Capacity
2
Components
Solar + Battery
5y 1m
In Queue
System Impact Study
IA Status
COD target: 2028
Total Duration
7y 2m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-06-01
The EUISMOD project is a proposed 1246.96 MW hybrid solar and battery energy storage development in Kern County, California. The project consists of 623.48 MW of solar photovoltaic generation and 623.48 MW of battery energy storage. The project is interconnected to Southern California Edison (SCE) and is currently active in the CAISO interconnection queue as queue ID CAISO-2055.
The EUISMOD project entered the CAISO queue on April 15, 2021, with a proposed commercial operation date of June 1, 2028. Its interconnection status is currently in the System Impact Study phase. The point of interconnection is the WHIRLWIND Substation at 230 kV. The project has been mentioned in recent news coverage.
Generated from interconnection queue and public data sources
State
CA
County
Kern
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SCE
Entity
CAISO
Service Type
—
Point of Interconnection
WHIRLWIND Substation 230 kV
Data Source
LBNL + Live
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- ASTORIA2_7_N001
- POI Substation
- Whirlwind Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.