DORIAN STORAGE (CAISO-2062) — Project Summary

Queue ID
CAISO-2062
Capacity
213.5926 MW
Technology
Battery
Status
active
Location
Los Angeles, CA
Region
CAISO
Developer
IA Status
System Impact Study

DORIAN STORAGE

CAISO-2062BetaActiveBatteryCAISOLBNL + Live

213.593 MW storage in Los Angeles, CA · In queue since April 2021 · Proposed COD August 2034

213.593 MW

Capacity

1

Components

Battery

5y 1m

In Queue

System Impact Study

IA Status

COD target: 2034

Interconnection

Total Duration

13y 4m

Impact Study25%
Queue EntryApr 15, 2021

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2034-08-26

About

The proposed DORIAN STORAGE project is a 213.59 MW battery storage development in Los Angeles County, California. It is located within the CAISO region and is interconnected with Southern California Edison (SCE) at the Antelope Substation 230 kV. The project entered the CAISO interconnection queue as queue ID CAISO-2062 on April 15, 2021, and has a proposed commercial operation date of August 26, 2034. Its interconnection status is currently in the System Impact Study phase.

The DORIAN STORAGE project consists of 213.59 MW of battery storage capacity. The project has been mentioned in recent news coverage related to the energy industry.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Los Angeles

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

SCE

Entity

CAISO

Service Type

Point of Interconnection

Antelope Substation 230 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
BIGSK230_2_N022
POI Substation
Antelope Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about DORIAN STORAGE