DORIAN STORAGE
213.593 MW storage in Los Angeles, CA · In queue since April 2021 · Proposed COD August 2034
213.593 MW
Capacity
1
Components
Battery
5y 1m
In Queue
System Impact Study
IA Status
COD target: 2034
Total Duration
13y 4m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2034-08-26
The proposed DORIAN STORAGE project is a 213.59 MW battery storage development in Los Angeles County, California. It is located within the CAISO region and is interconnected with Southern California Edison (SCE) at the Antelope Substation 230 kV. The project entered the CAISO interconnection queue as queue ID CAISO-2062 on April 15, 2021, and has a proposed commercial operation date of August 26, 2034. Its interconnection status is currently in the System Impact Study phase.
The DORIAN STORAGE project consists of 213.59 MW of battery storage capacity. The project has been mentioned in recent news coverage related to the energy industry.
Generated from interconnection queue and public data sources
State
CA
County
Los Angeles
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SCE
Entity
CAISO
Service Type
—
Point of Interconnection
Antelope Substation 230 kV
Data Source
LBNL + Live
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- BIGSK230_2_N022
- POI Substation
- Antelope Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.