SOLEIL CANTIL (CAISO-2078) — Project Summary

Queue ID
CAISO-2078
Capacity
597.3 MW
Technology
Solar+Battery
Status
active
Location
Kern, CA
Region
CAISO
Developer
IA Status
System Impact Study

SOLEIL CANTIL

CAISO-2078BetaActiveSolarBatteryCAISOLBNL + Live

597.3 MW hybrid in Kern, CA · In queue since April 2021 · Proposed COD February 2033

597.3 MW

Capacity

2

Components

Solar + Battery

5y 1m

In Queue

System Impact Study

IA Status

COD target: 2033

Interconnection

Total Duration

11y 10m

Impact Study25%
Queue EntryApr 15, 2021

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2033-02-26

Technology
Solar372.3 MW · 62%
Battery225 MW · 38%
About

The SOLEIL CANTIL project is a proposed 597.3 MW hybrid solar and battery energy storage project located in Kern County, California. The development project, consisting of 372.3 MW of solar capacity and 225 MW of battery storage, is interconnected to the CAISO grid at the Windhub Substation 500kV.

The project is listed in the CAISO interconnection queue as queue ID CAISO-2078, with an entry date of April 15, 2021. The proposed commercial operation date is February 26, 2033. The project's interconnection status is currently in the System Impact Study phase.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Kern

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

SCE

Entity

CAISO

Service Type

Point of Interconnection

Windhub Substation 500kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
ALTA6B2_7_N003
POI Substation
Windhub Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.