SOLSKEN (CAISO-2085) — Project Summary

Queue ID
CAISO-2085
Capacity
809.42 MW
Technology
Solar+Battery
Status
active
Location
Tulare, CA
Region
CAISO
Developer
IA Status
System Impact Study

SOLSKEN

CAISO-2085BetaActiveSolarBatteryCAISOLBNL + Live

809.42 MW hybrid in Tulare, CA · In queue since April 2021 · Proposed COD February 2033

809.42 MW

Capacity

2

Components

Solar + Battery

5y 1m

In Queue

System Impact Study

IA Status

COD target: 2033

Interconnection

Total Duration

11y 10m

Impact Study25%
Queue EntryApr 15, 2021

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2033-02-26

Technology
Solar464.42 MW · 57%
Battery345 MW · 43%
About

The SOLSKEN project is a proposed solar and battery energy storage hybrid project located in Tulare County, California. The development project, with a total capacity of 809.42 MW, consists of a 464.42 MW solar component and a 345 MW battery energy storage system. It is located within the CAISO region and is being developed for Southern California Edison (SCE).

The project is listed in the CAISO interconnection queue as entry CAISO-2085, with an interconnection queue entry date of April 15, 2021. The proposed commercial operation date is February 26, 2033. Its interconnection status is currently in the System Impact Study phase, and the point of interconnection is the Springville Substation at 230 kV.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Tulare

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

SCE

Entity

CAISO

Service Type

Point of Interconnection

Springville Substation 230 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
SPRINGVL_6_N006
POI Substation
Springville Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.