GREASEWOOD ENERGY STORAGE (CAISO-2089) — Project Summary

Queue ID
CAISO-2089
Capacity
513.2 MW
Technology
Battery
Status
active
Location
Kern, CA
Region
CAISO
Developer
IA Status
System Impact Study

GREASEWOOD ENERGY STORAGE

CAISO-2089BetaActiveBatteryCAISOLBNL + Live

513.2 MW storage in Kern, CA · In queue since April 2021 · Proposed COD February 2033

513.2 MW

Capacity

1

Components

Battery

5y 1m

In Queue

System Impact Study

IA Status

COD target: 2033

Interconnection

Total Duration

11y 10m

Impact Study25%
Queue EntryApr 15, 2021

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2033-02-26

About

The proposed GREASEWOOD ENERGY STORAGE project is a 513.2 MW battery storage development in Kern County, California. Interconnection is requested through the CAISO queue (queue ID CAISO-2089) with Southern California Edison (SCE) as the utility. The project entered the queue on April 15, 2021, and has a proposed commercial operation date of February 26, 2033. The interconnection status is currently in the System Impact Study phase.

The project is located at the Whirlwind Substation 500 kV Point of Interconnection. Recent news coverage has discussed the project.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Kern

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

SCE

Entity

CAISO

Service Type

Point of Interconnection

Whirlwind Substation 500 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
ASTORIA2_7_N001
POI Substation
Whirlwind Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.