SILVER STAR SOLAR (CAISO-2142) — Project Summary

Queue ID
CAISO-2142
Capacity
1033.5276 MW
Technology
Solar+Battery
Status
active
Location
Nye, NV
Region
CAISO
Developer
IA Status
In Progress (unknown study)

SILVER STAR SOLAR

CAISO-2142BetaActiveSolarBatteryCAISOLBNL + Live

1,033.528 MW hybrid in Nye, NV · In queue since April 2021 · Proposed COD December 2028

1,033.528 MW

Capacity

2

Components

Solar + Battery

5y 1m

In Queue

In Progress (unknown study)

IA Status

COD target: 2028

Interconnection

Total Duration

7y 8m

In Study38%
Queue EntryApr 15, 2021

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-01

Technology
Solar516.764 MW · 50%
Battery516.764 MW · 50%
About

The Silver Star Solar project is a proposed 1033.53 MW hybrid solar and battery energy storage project located in Nye County, Nevada. The development project consists of 516.76 MW of solar photovoltaic generation paired with 516.76 MW of battery energy storage. The project is listed in the CAISO interconnection queue as entry CAISO-2142, with a queue entry date of April 15, 2021, and a proposed commercial operation date of December 1, 2028. The interconnection agreement status is listed as "In Progress (unknown study)".

The proposed project is interconnected to the grid at the Lathrop Wells Substation 230 kV. The project has appeared in recent news coverage related to industry and regulatory matters.

Generated from interconnection queue and public data sources

Project Details

State

NV

County

Nye

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

GLW

Entity

CAISO

Service Type

Point of Interconnection

Lathrop Wells Substation 230 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_NP15_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.