DANDELION HYBRID SOLAR (CAISO-2145) — Project Summary

Queue ID
CAISO-2145
Capacity
334.2 MW
Technology
Solar+Battery
Status
active
Location
Nye, NV
Region
CAISO
Developer
IA Status
System Impact Study

DANDELION HYBRID SOLAR

CAISO-2145BetaActiveSolarBatteryCAISOLBNL + Live

334.2 MW hybrid in Nye, NV · In queue since April 2021 · Proposed COD December 2027

334.2 MW

Capacity

2

Components

Solar + Battery

5y 1m

In Queue

System Impact Study

IA Status

COD target: 2027

Interconnection

Total Duration

6y 8m

Impact Study25%
Queue EntryApr 15, 2021

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-12-26

Technology
Solar223.33 MW · 67%
Battery110.87 MW · 33%
About

The DANDELION HYBRID SOLAR project is a proposed 334.2 MW hybrid solar and battery energy storage development in Nye County, Nevada. The project consists of a 223.33 MW solar photovoltaic array coupled with a 110.87 MW battery energy storage system. It is located within the California Independent System Operator (CAISO) region and is interconnected to the Vista Substation at 230 kV.

The project, identified as queue ID CAISO-2145, entered the CAISO interconnection queue on April 15, 2021. Its proposed commercial operation date is December 26, 2027. As of the latest data, the project's interconnection status is in the System Impact Study phase. The identified utility for the project is GLW. The DANDELION HYBRID SOLAR project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

NV

County

Nye

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

GLW

Entity

CAISO

Service Type

Point of Interconnection

Vista Substation 230 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
STELLING_1_N007
POI Substation
Monta Vista Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about DANDELION HYBRID SOLAR