DANDELION HYBRID SOLAR
334.2 MW hybrid in Nye, NV · In queue since April 2021 · Proposed COD December 2027
334.2 MW
Capacity
2
Components
Solar + Battery
5y 1m
In Queue
System Impact Study
IA Status
COD target: 2027
Total Duration
6y 8m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-12-26
The DANDELION HYBRID SOLAR project is a proposed 334.2 MW hybrid solar and battery energy storage development in Nye County, Nevada. The project consists of a 223.33 MW solar photovoltaic array coupled with a 110.87 MW battery energy storage system. It is located within the California Independent System Operator (CAISO) region and is interconnected to the Vista Substation at 230 kV.
The project, identified as queue ID CAISO-2145, entered the CAISO interconnection queue on April 15, 2021. Its proposed commercial operation date is December 26, 2027. As of the latest data, the project's interconnection status is in the System Impact Study phase. The identified utility for the project is GLW. The DANDELION HYBRID SOLAR project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
NV
County
Nye
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
GLW
Entity
CAISO
Service Type
—
Point of Interconnection
Vista Substation 230 kV
Data Source
LBNL + Live
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- STELLING_1_N007
- POI Substation
- Monta Vista Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.