SUNBAKED SOLAR (CAISO-2149) — Project Summary

Queue ID
CAISO-2149
Capacity
1023.64 MW
Technology
Solar+Battery
Status
active
Location
Inyo, CA
Region
CAISO
Developer
IA Status
IA Executed

SUNBAKED SOLAR

CAISO-2149BetaActiveSolarBatteryCAISOLBNL + Live

1,023.64 MW hybrid in Inyo, CA · In queue since April 2021 · Proposed COD February 2029

1,023.64 MW

Capacity

2

Components

Solar + Battery

5y 1m

In Queue

IA Executed

IA Status

COD target: 2029

Interconnection

Total Duration

7y 10m

Construction75%
Queue EntryApr 15, 2021

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2029-02-26

Technology
Solar508.56 MW · 50%
Battery515.08 MW · 50%
About

The proposed SUNBAKED SOLAR project is a 1023.64 MW hybrid solar and battery energy storage development in Inyo County, California. The project consists of a 508.56 MW solar array coupled with a 515.08 MW battery energy storage system. It is located within the CAISO region and is interconnected to the Trout Canyon Substation at 230 kV.

SUNBAKED SOLAR entered the CAISO interconnection queue as queue ID CAISO-2149 on April 15, 2021, with a proposed commercial operation date of February 26, 2029. The project's interconnection agreement has been executed. The transmission provider is GLW.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Inyo

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

GLW

Entity

CAISO

Service Type

Point of Interconnection

Trout Canyon Substation 230 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
CANYONP4_7_GN001
POI Substation
Canyon

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.