ROUGH HAT 3 (CAISO-2150) — Project Summary

Queue ID
CAISO-2150
Capacity
614 MW
Technology
Solar+Battery
Status
active
Location
Clark, NV
Region
CAISO
Developer
IA Status
System Impact Study

ROUGH HAT 3

CAISO-2150BetaActiveSolarBatteryCAISOLBNL + Live

614 MW hybrid in Clark, NV · In queue since April 2021 · Proposed COD September 2028

614 MW

Capacity

2

Components

Solar + Battery

5y 1m

In Queue

System Impact Study

IA Status

COD target: 2028

Interconnection

Total Duration

7y 5m

Impact Study25%
Queue EntryApr 15, 2021

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-09-15

Technology
Solar307 MW · 50%
Battery307 MW · 50%
About

The ROUGH HAT 3 development project is a proposed 614 MW hybrid solar and battery energy storage system located in Clark County, Nevada. The project consists of 307 MW of solar photovoltaic generation paired with 307 MW of battery storage. It is listed in the California Independent System Operator (CAISO) interconnection queue under queue ID CAISO-2150.

The project entered the CAISO queue on April 15, 2021, and has a proposed commercial operation date of September 15, 2028. Its interconnection status is currently in the System Impact Study phase. The point of interconnection is the Trout Canyon Substation at 230 kV. Recent news coverage has discussed the project.

Generated from interconnection queue and public data sources

Project Details

State

NV

County

Clark

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

GLW

Entity

CAISO

Service Type

Point of Interconnection

Trout Canyon Substation 230 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
CANYONP4_7_GN001
POI Substation
Canyon

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.