FRIGATEBIRD STORAGE
213.549 MW storage in San Diego, CA · In queue since April 2021 · Proposed COD March 2035
213.549 MW
Capacity
1
Components
Battery
5y 1m
In Queue
System Impact Study
IA Status
COD target: 2035
Total Duration
13y 11m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2035-03-05
The proposed FRIGATEBIRD STORAGE project is a 213.55 MW battery storage development in San Diego County, California. The project, located within the CAISO region and interconnected with San Diego Gas & Electric (SDGE), consists entirely of battery storage. It is currently listed as active in the CAISO interconnection queue under queue ID CAISO-2153.
The project entered the queue on April 15, 2021, and has a proposed commercial operation date of March 5, 2035. Its interconnection status is currently in the System Impact Study phase. The point of interconnection is the Silvergate Substation at 230 kV.
Generated from interconnection queue and public data sources
State
CA
County
San Diego
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SDGE
Entity
CAISO
Service Type
—
Point of Interconnection
Silvergate Substation 230 kV
Data Source
LBNL + Live
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.