BOULDER BRUSH HYBRID (CAISO-2177) — Project Summary

Queue ID
CAISO-2177
Capacity
419.71928 MW
Technology
Wind+Battery
Status
active
Location
San Diego, CA
Region
CAISO
Developer
IA Status
System Impact Study

BOULDER BRUSH HYBRID

CAISO-2177BetaActiveWindBatteryCAISOLBNL + Live

419.719 MW hybrid in San Diego, CA · In queue since April 2021 · Proposed COD February 2031

419.719 MW

Capacity

2

Components

Wind + Battery

5y 1m

In Queue

System Impact Study

IA Status

COD target: 2031

Interconnection

Total Duration

9y 10m

Impact Study25%
Queue EntryApr 15, 2021

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2031-02-05

Technology
Wind105.8 MW · 25%
Battery313.919 MW · 75%
About

The Boulder Brush Hybrid project is a proposed wind and battery energy storage development with a total capacity of 419.72 MW, located in San Diego County, California. The project consists of 105.8 MW of wind generation capacity and 313.92 MW of battery energy storage. It is being developed within the California Independent System Operator (CAISO) region and has interconnection queue ID CAISO-2177.

The project entered the CAISO interconnection queue on April 15, 2021, and has a proposed commercial operation date of February 5, 2031. Its interconnection status is currently in the System Impact Study phase. The point of interconnection is the Suncrest - Ocotillo 500 kV Line, and the interconnecting utility is San Diego Gas & Electric (SDGE). The Boulder Brush Hybrid project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

San Diego

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

SDGE

Entity

CAISO

Service Type

Point of Interconnection

Suncrest - Ocotillo 500 kV Line

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.