TOWNSHIP EXPANSION (CAISO-2195) — Project Summary

Queue ID
CAISO-2195
Capacity
22.6 MW
Technology
Battery
Status
active
Location
Sutter, CA
Region
CAISO
Developer
IA Status
Feasibility Study

TOWNSHIP EXPANSION

CAISO-2195BetaActiveGasBatteryCAISOLBNL

22.6 MW hybrid in Sutter, CA · In queue since October 2022 · Proposed COD June 2024

22.6 MW

Capacity

2

Components

Gas + Battery

3y 7m

In Queue

Feasibility Study

IA Status

COD target: 2024

Interconnection

Total Duration

1y 8m

Schedule

23 months past proposed COD

Feasibility Study13%
Queue EntryOct 13, 2022

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-06-01

Technology
Gas11.3 MW · 50%
Battery11.3 MW · 50%
About

The Township Expansion project is a proposed 22.6 MW hybrid development in Sutter County, California. Interconnecting within the CAISO queue as entry CAISO-2195 on October 13, 2022, the project consists of an 11.3 MW gas-fired component and an 11.3 MW battery energy storage system. The proposed commercial operation date is June 1, 2024.

The project's interconnection to PG&E is currently in the Feasibility Study phase, with the point of interconnection at the Greenleaf #1 115 kV Tap. The project is listed as active in the CAISO interconnection queue.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Sutter

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

PGAE

Entity

CAISO

Service Type

Point of Interconnection

Greenleaf #1 115 kV Tap

Data Source

LBNL

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about TOWNSHIP EXPANSION