GWF TRACY
185 MW hybrid in San Joaquin, CA · In queue since January 1970 · Proposed COD April 2027
185 MW
Capacity
2
Components
Gas + Battery
56y 4m
In Queue
IA Executed
IA Status
Signed Jan 1970
Queue → IA
<1 month
IA → COD
57y 3m
Total Duration
<1 month
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 6–18 months
Proposed COD: 2027-04-28
The GWF TRACY project is a proposed hybrid development project located in San Joaquin County, California, within the CAISO region. The project, with a total capacity of 185 MW, consists of a 145 MW gas component and a 40 MW battery component.
The project is listed in the CAISO interconnection queue as entry CAISO-268, with an interconnection queue entry date of January 1, 1970. The proposed commercial operation date is April 28, 2027, and the Interconnection Agreement (IA) has been executed as of January 1, 1970. The project is interconnected to the PGAE utility grid at the Tesla-Manteca 115kV line via Schulte Switchyard.
Generated from interconnection queue and public data sources
State
CA
County
San Joaquin
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
—
Point of Interconnection
Tesla-Manteca 115kV line via Schulte Switchyard
Data Source
LBNL + Live
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about GWF TRACY