ALTA VISTA SUNTOWER GENERATING STATION (CAISO-297) — Project Summary

Queue ID
CAISO-297
Capacity
132 MW
Technology
Solar+Battery
Status
active
Location
Los Angeles, CA
Region
CAISO
Developer
IA Status
IA Executed

ALTA VISTA SUNTOWER GENERATING STATION

CAISO-297BetaActiveSolarBatteryCAISOLBNL + Live

132 MW hybrid in Los Angeles, CA · In queue since January 2008 · Proposed COD December 2027

132 MW

Capacity

2

Components

Solar + Battery

18y 4m

In Queue

IA Executed

IA Status

Signed Jun 2011

Interconnection

Queue → IA

3y 5m

IA → COD

16y 6m

Total Duration

3y 5m

Construction75%
Queue EntryJan 18, 2008

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection AgreementJun 30, 2011

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2027-12-11

Technology
Solar66 MW · 50%
Battery66 MW · 50%
About

The Alta Vista Suntower Generating Station is a proposed 132 MW hybrid solar and battery project located in Los Angeles County, California. The development project consists of 66 MW of solar generation paired with 66 MW of battery storage. It is interconnected to the CAISO grid under queue ID CAISO-297, with an original queue entry date of January 18, 2008. The proposed commercial operation date is December 11, 2027.

The project's interconnection agreement (IA) has been executed as of June 30, 2011. The project is connected to the Neenach-Bailey 66kV line and is within the service territory of Southern California Edison (SCE).

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Los Angeles

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

SCE

Entity

CAISO

Service Type

Point of Interconnection

Neenach-Bailey 66kV line

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about ALTA VISTA SUNTOWER GENERATING STATION