11.5 MW generation in Lassen, CA · In queue since April 2023 · Proposed COD March 2027
11.5 MW
Capacity
1
Components
Other
3y 1m
In Queue
Not Started
IA Status
COD target: 2027
Total Duration
3y 11m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-03-31
The Mount Lassen Power Plant is a proposed 11.5 MW generation project located in Lassen County, California. The project, which utilizes an unspecified "Other" technology, is listed in the CAISO interconnection queue as queue ID CAISO-40082. Its queue entry date is April 17, 2023, and the proposed commercial operation date is March 31, 2027. Pacific Gas and Electric (PGAE) is the utility.
The project's interconnection agreement (IA) status is listed as "Not Started." The point of interconnection (POI) is Caribou - Westwood. The project has appeared in recent news.
Generated from interconnection queue and public data sources
State
CA
County
Lassen
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
—
Point of Interconnection
Caribou - Westwood
Data Source
LBNL
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.