MIDWAY PEAKING AGGREGATE (CAISO-54) — Project Summary

Queue ID
CAISO-54
Capacity
239.8 MW
Technology
Battery
Status
active
Location
Fresno, CA
Region
CAISO
Developer
IA Status
IA Executed

MIDWAY PEAKING AGGREGATE

CAISO-54BetaActiveGasBatteryCAISOLBNL + Live

239.8 MW hybrid in Fresno, CA · In queue since January 1970 · Proposed COD June 2027

239.8 MW

Capacity

2

Components

Gas + Battery

56y 4m

In Queue

IA Executed

IA Status

Signed Jan 1970

Interconnection

Queue → IA

<1 month

IA → COD

57y 5m

Total Duration

<1 month

Construction75%
Queue EntryJan 1, 1970

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection AgreementJan 1, 1970

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2027-06-30

Technology
Gas119.9 MW · 50%
Battery119.9 MW · 50%
About

The Midway Peaking Aggregate is a proposed hybrid project in Fresno County, California, within the CAISO region. The project, listed as CAISO-54 in the CAISO interconnection queue, has a total capacity of 239.8 MW. It is a hybrid facility consisting of 119.9 MW of gas generation and 119.9 MW of battery storage.

The project entered the CAISO queue on January 1, 1970, with a proposed commercial operation date of June 30, 2027. The interconnection agreement (IA) has been executed as of January 1, 1970. The point of interconnection is the Panoche Substation, and the interconnecting utility is PG&E.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Fresno

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

PGAE

Entity

CAISO

Service Type

Point of Interconnection

Panoche Substation

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
CALGEN3G_7_B1
POI Substation
Panoche Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.