Alembic (CAISO-54512) — Project Summary

Queue ID
CAISO-54512
Capacity
304 MW
Technology
Battery
Status
active
Location
Merced, CA
Region
CAISO
Developer
IA Status
Not Started

Alembic

CAISO-54512BetaActiveGasBatteryCAISOLBNL

304 MW hybrid in Merced, CA · In queue since April 2023 · Proposed COD March 2028

304 MW

Capacity

2

Components

Gas + Battery

3y 1m

In Queue

Not Started

IA Status

COD target: 2028

Interconnection

Total Duration

4y 11m

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-03-31

Technology
Gas152 MW · 50%
Battery152 MW · 50%
About

The Alembic project is a proposed 304 MW hybrid development in Merced County, California. The project, located within the CAISO region and interconnected with PG&E, consists of a 152 MW gas component and a 152 MW battery energy storage system. It is listed in the CAISO interconnection queue as entry CAISO-54512, with a queue entry date of April 17, 2023, and a proposed commercial operation date of March 31, 2028. As of the latest data, the interconnection agreement has not yet been started.

The Alembic project is a hybrid project consisting of both gas and battery components. It is located in Merced County, California, and is in the CAISO interconnection queue. The project has appeared in recent news.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Merced

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

PGAE

Entity

CAISO

Service Type

Point of Interconnection

LOS BANOS 230 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
SNTANLA_6_N001
POI Substation
Los Banos Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.