Alembic
304 MW hybrid in Merced, CA · In queue since April 2023 · Proposed COD March 2028
304 MW
Capacity
2
Components
Gas + Battery
3y 1m
In Queue
Not Started
IA Status
COD target: 2028
Total Duration
4y 11m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-03-31
The Alembic project is a proposed 304 MW hybrid development in Merced County, California. The project, located within the CAISO region and interconnected with PG&E, consists of a 152 MW gas component and a 152 MW battery energy storage system. It is listed in the CAISO interconnection queue as entry CAISO-54512, with a queue entry date of April 17, 2023, and a proposed commercial operation date of March 31, 2028. As of the latest data, the interconnection agreement has not yet been started.
The Alembic project is a hybrid project consisting of both gas and battery components. It is located in Merced County, California, and is in the CAISO interconnection queue. The project has appeared in recent news.
Generated from interconnection queue and public data sources
State
CA
County
Merced
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
—
Point of Interconnection
LOS BANOS 230 kV
Data Source
LBNL
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- SNTANLA_6_N001
- POI Substation
- Los Banos Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Alembic