Sullivan Energy Center (CAISO-54515) — Project Summary

Queue ID
CAISO-54515
Capacity
406.737 MW
Technology
Solar+Battery
Status
active
Location
Merced, CA
Region
CAISO
Developer
IA Status
Not Started

Sullivan Energy Center

CAISO-54515BetaActiveSolarBatteryCAISOLBNL

406.737 MW hybrid in Merced, CA · In queue since April 2023 · Proposed COD January 2029

406.737 MW

Capacity

2

Components

Solar + Battery

3y 1m

In Queue

Not Started

IA Status

COD target: 2029

Interconnection

Total Duration

5y 9m

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-01-01

Technology
Solar203.688 MW · 50%
Battery203.049 MW · 50%
About

The Sullivan Energy Center is a proposed 406.74 MW hybrid solar and battery energy storage project located in Merced County, California. The project, which consists of 203.69 MW of solar capacity and 203.05 MW of battery storage, is interconnected to the PG&E utility network within the CAISO region. The project entered the CAISO interconnection queue as queue ID CAISO-54515 on April 17, 2023, with a proposed commercial operation date of January 1, 2029. As of the latest data, the interconnection agreement has not yet been started.

The Sullivan Energy Center development has been the subject of recent news coverage, with four articles categorized as industry news and deal announcements.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Merced

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

PGAE

Entity

CAISO

Service Type

Point of Interconnection

QUINTO SW STA-FINK SW STA

Data Source

LBNL

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.