Duran (CAISO-54526) — Project Summary

Queue ID
CAISO-54526
Capacity
600 MW
Technology
Battery
Status
active
Location
San Bernardino, CA
Region
CAISO
Developer
IA Status
Not Started

Duran

CAISO-54526BetaActiveGasBatteryCAISOLBNL

600 MW hybrid in San Bernardino, CA · In queue since April 2023 · Proposed COD March 2028

600 MW

Capacity

2

Components

Gas + Battery

3y 1m

In Queue

Not Started

IA Status

COD target: 2028

Interconnection

Total Duration

4y 11m

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-03-31

Technology
Gas300 MW · 50%
Battery300 MW · 50%
About

The Duran project is a proposed 600 MW hybrid development in San Bernardino County, California. The project, which consists of 300 MW of gas generation and 300 MW of battery storage, is located within the CAISO region and connected to the SCE utility.

The project is listed in the CAISO interconnection queue as CAISO-54526, with an entry date of April 17, 2023, and a proposed commercial operation date of March 31, 2028. As of the latest data, the interconnection agreement has not yet been started. The point of interconnection is the LUGO 500 kV substation. The Duran project has been mentioned in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

San Bernardino

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

SCE

Entity

CAISO

Service Type

Point of Interconnection

LUGO 500 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
POI Substation
Lugo Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Duran