Egret
1,701.56 MW hybrid in Fresno, CA · In queue since April 2023 · Proposed COD September 2028
1,701.56 MW
Capacity
2
Components
Solar + Battery
3y 1m
In Queue
Not Started
IA Status
COD target: 2028
Total Duration
5y 5m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-09-01
The Egret project is a proposed 1701.56 MW hybrid solar and battery energy storage project located in Fresno County, California. The development project consists of a 1055.56 MW solar component and a 646 MW battery energy storage system.
The project is listed in the CAISO interconnection queue as CAISO-54559, with a queue entry date of April 17, 2023, and a proposed commercial operation date of September 1, 2028. As of the latest data, the interconnection agreement status is "Not Started." The point of interconnection is the MANNING 500 kV substation.
Generated from interconnection queue and public data sources
State
CA
County
Fresno
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
LSPC
Entity
CAISO
Service Type
—
Point of Interconnection
MANNING 500 kV
Data Source
LBNL
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.