Borderline Solar
1,267.659 MW hybrid in Inyo, CA · In queue since April 2023 · Proposed COD October 2028
1,267.659 MW
Capacity
2
Components
Solar + Battery
3y 1m
In Queue
Not Started
IA Status
COD target: 2028
Total Duration
5y 6m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-10-01
Borderline Solar is a proposed hybrid solar and battery project located in Inyo County, California. The development project, with a total capacity of 1267.66 MW, consists of a 638.04 MW solar component and a 629.61 MW battery energy storage system. The project is being developed within the California Independent System Operator (CAISO) region.
The project, identified as CAISO-54571 in the interconnection queue, entered the queue on April 17, 2023, with a proposed commercial operation date of October 1, 2028. As of the latest data, the interconnection agreement (IA) status is "Not Started." The point of interconnection (POI) is the TROUT CANYON 230 kV substation. The listed utility is GLW. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
CA
County
Inyo
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
GLW
Entity
CAISO
Service Type
—
Point of Interconnection
TROUT CANYON 230 kV
Data Source
LBNL
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- CANYONP4_7_GN001
- POI Substation
- Canyon
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.