Chance Solar (CAISO-54580) — Project Summary

Queue ID
CAISO-54580
Capacity
1789.991 MW
Technology
Solar+Battery
Status
active
Location
Nye, NV
Region
CAISO
Developer
IA Status
Not Started

Chance Solar

CAISO-54580BetaActiveSolarBatteryCAISOLBNL

1,789.991 MW hybrid in Nye, NV · In queue since April 2023 · Proposed COD October 2028

1,789.991 MW

Capacity

2

Components

Solar + Battery

3y 1m

In Queue

Not Started

IA Status

COD target: 2028

Interconnection

Total Duration

5y 6m

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-10-01

Technology
Solar895.772 MW · 50%
Battery894.219 MW · 50%
About

Chance Solar is a proposed project located in Nye County, Nevada, with a total capacity of 1789.99 MW. The hybrid project, consisting of both solar and battery components, is being developed within the California Independent System Operator (CAISO) region. The solar component has a capacity of 895.77 MW, while the battery component has a capacity of 894.22 MW.

The project, identified in the CAISO queue as CAISO-54580, entered the queue on April 17, 2023, with a proposed commercial operation date of October 1, 2028. As of the latest data, the interconnection agreement (IA) status is "Not Started." Recent news coverage, including seven articles, has focused on the project, with categories including industry, regulatory, and grid-related topics.

Generated from interconnection queue and public data sources

Project Details

State

NV

County

Nye

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

GLW

Entity

CAISO

Service Type

Point of Interconnection

BEATTY 230kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_NP15_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.