Maravillosa Solar 1
406.67 MW hybrid in Kings, CA · In queue since April 2023 · Proposed COD June 2029
406.67 MW
Capacity
2
Components
Solar + Battery
3y 1m
In Queue
Not Started
IA Status
COD target: 2029
Total Duration
6y 2m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-06-30
Maravillosa Solar 1 is a proposed 406.67 MW hybrid solar and battery project located in Kings County, California. The development project consists of a 204.06 MW solar array coupled with a 202.61 MW battery energy storage system. The project is in the CAISO interconnection queue as entry CAISO-54624, with a queue entry date of April 17, 2023, and a proposed commercial operation date of June 30, 2029. Interconnection service will be provided by PG&E at the GATES-MIDWAY 500kV point of interconnection. As of the current data, the Interconnection Agreement (IA) has not yet been started.
Generated from interconnection queue and public data sources
State
CA
County
Kings
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
—
Point of Interconnection
GATES-MIDWAY 500kV
Data Source
LBNL
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Maravillosa Solar 1