Maravillosa Solar 2
811.997 MW hybrid in Kern, CA · In queue since April 2023 · Proposed COD June 2029
811.997 MW
Capacity
2
Components
Solar + Battery
3y 1m
In Queue
Not Started
IA Status
COD target: 2029
Total Duration
6y 2m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-06-30
Maravillosa Solar 2 is a proposed 812.0 MW hybrid solar and battery project located in Kern County, California. The development project consists of a 407.34 MW solar component and a 404.66 MW battery energy storage system. It is interconnected to the CAISO grid under queue ID CAISO-54625, with a queue entry date of April 17, 2023, and a proposed commercial operation date of June 30, 2029. The point of interconnection is the GATES-MIDWAY 500kV substation.
The project's interconnection agreement status is listed as "Not Started". The proposed project is located within the CAISO region and will connect to the PG&E utility service territory. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
CA
County
Kern
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
—
Point of Interconnection
GATES-MIDWAY 500kV
Data Source
LBNL
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.