Muon
2,342.48 MW hybrid in Fresno, CA · In queue since April 2023 · Proposed COD September 2028
2,342.48 MW
Capacity
2
Components
Solar + Battery
3y 1m
In Queue
Not Started
IA Status
COD target: 2028
Total Duration
5y 5m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-09-30
The proposed Muon project is a 2342.48 MW hybrid solar and battery energy storage development project located in Fresno County, California. The project, which consists of 1171.24 MW of solar capacity and 1171.24 MW of battery storage, is interconnected to PG&E within the CAISO region.
The project is listed in the CAISO interconnection queue as entry CAISO-54634, with a queue entry date of April 17, 2023. The proposed commercial operation date is September 30, 2028. As of the latest data, the interconnection agreement status is "Not Started". The point of interconnection is the LOS BANOS-MIDWAY #2 substation.
Generated from interconnection queue and public data sources
State
CA
County
Fresno
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
—
Point of Interconnection
LOS BANOS-MIDWAY #2
Data Source
LBNL
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.