Fornax
206.25 MW hybrid in Fresno, CA · In queue since April 2023 · Proposed COD December 2031
206.25 MW
Capacity
2
Components
Solar + Battery
3y 1m
In Queue
Not Started
IA Status
COD target: 2031
Total Duration
8y 8m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2031-12-01
The Fornax project is a proposed 206.25 MW hybrid solar and battery energy storage project located in Fresno County, California. The development project consists of 103.12 MW of solar photovoltaic generation paired with 103.12 MW of battery energy storage.
The project is listed in the CAISO interconnection queue as entry CAISO-54643, with a queue entry date of April 17, 2023. The proposed commercial operation date is December 1, 2031. Interconnection service has not yet been initiated for the project, and the point of interconnection is the Tranquillity SW STA 230 kV substation.
Generated from interconnection queue and public data sources
State
CA
County
Fresno
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
—
Point of Interconnection
TRANQUILLITY SW STA 230 kV
Data Source
LBNL
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Fornax