TENDRIL
200 MW hybrid in Kern, CA · In queue since April 2023 · Proposed COD December 2031
200 MW
Capacity
2
Components
Solar + Battery
3y 1m
In Queue
Not Started
IA Status
COD target: 2031
Total Duration
8y 8m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2031-12-31
The TENDRIL project is a proposed 200 MW hybrid solar and battery energy storage development in Kern County, California. The project consists of 100 MW of solar photovoltaic generation paired with a 100 MW battery energy storage system.
The project is listed in the CAISO interconnection queue under queue ID CAISO-54652, with an entry date of April 17, 2023. The proposed commercial operation date is December 31, 2031. As of the current queue status, the interconnection agreement has not yet been started.
Generated from interconnection queue and public data sources
State
CA
County
Kern
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
—
Point of Interconnection
ARCO-MIDWAY
Data Source
LBNL
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about TENDRIL