Shoestring (CAISO-54665) — Project Summary

Queue ID
CAISO-54665
Capacity
280 MW
Technology
Solar+Battery
Status
active
Location
Fresno, CA
Region
CAISO
Developer
IA Status
Not Started

Shoestring

CAISO-54665BetaActiveSolarBatteryCAISOLBNL

280 MW hybrid in Fresno, CA · In queue since April 2023 · Proposed COD May 2031

280 MW

Capacity

2

Components

Solar + Battery

3y 1m

In Queue

Not Started

IA Status

COD target: 2031

Interconnection

Total Duration

8y 1m

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2031-05-01

Technology
Solar140 MW · 50%
Battery140 MW · 50%
About

The Shoestring project is a proposed 280 MW hybrid solar and battery energy storage development in Fresno County, California. The project consists of 140 MW of solar photovoltaic generation paired with 140 MW of battery energy storage. It is located within the California Independent System Operator (CAISO) region and is interconnected to the LSPC utility.

The project, identified as CAISO-54665 in the CAISO interconnection queue, entered the queue on April 17, 2023, with a proposed commercial operation date of May 1, 2031. As of the current data, the interconnection agreement (IA) status is "Not Started". The point of interconnection (POI) is the MANNING 500 kV substation. The Shoestring project has been mentioned in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Fresno

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

LSPC

Entity

CAISO

Service Type

Point of Interconnection

MANNING 500 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.