Solar 373 (CAISO-54676) — Project Summary

Queue ID
CAISO-54676
Capacity
814 MW
Technology
Solar+Battery
Status
active
Location
Nye, NV
Region
CAISO
Developer
IA Status
Not Started

Solar 373

CAISO-54676BetaActiveSolarBatteryCAISOLBNL

814 MW hybrid in Nye, NV · In queue since April 2023 · Proposed COD December 2028

814 MW

Capacity

2

Components

Solar + Battery

3y 1m

In Queue

Not Started

IA Status

COD target: 2028

Interconnection

Total Duration

5y 8m

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-29

Technology
Solar407 MW · 50%
Battery407 MW · 50%
About

Solar 373 is a proposed 814 MW hybrid solar and battery project in Nye County, Nevada. The development project consists of 407 MW of solar capacity coupled with 407 MW of battery storage. The project is located within the California Independent System Operator (CAISO) region and is being managed by GLW.

The project, identified as CAISO-54676 in the CAISO interconnection queue, entered the queue on April 17, 2023, with a proposed commercial operation date of December 29, 2028. As of the current data, the interconnection agreement (IA) status is "Not Started". The point of interconnection (POI) is the VALLEY SWITCH 230 kV. The project has been mentioned in recent news coverage related to the energy industry.

Generated from interconnection queue and public data sources

Project Details

State

NV

County

Nye

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

GLW

Entity

CAISO

Service Type

Point of Interconnection

VALLEY SWITCH 230 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_NP15_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

News & Articles (1)Beta

Last updated 2026-03-26