Brown Bear
304.425 MW hybrid in Kings, CA · In queue since April 2023 · Proposed COD March 2029
304.425 MW
Capacity
3
Components
Solar + Battery + Solar+Battery
3y 1m
In Queue
Not Started
IA Status
COD target: 2029
Total Duration
5y 11m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-03-30
The Brown Bear project is a proposed 304.43 MW hybrid solar and battery energy storage development in Kings County, California. The project consists of 300.74 MW of solar, 1.4 MW of battery storage, and 2.28 MW of co-located solar and battery capacity. It is located within the California Independent System Operator (CAISO) region and is interconnected with Pacific Gas & Electric (PGAE) at the LOS BANOS-MIDWAY #2 point of interconnection.
The project, identified as CAISO-54696 in the CAISO interconnection queue, entered the queue on April 17, 2023, with a proposed commercial operation date of March 30, 2029. As of the current data, an Interconnection Agreement (IA) has not been started for the Brown Bear project.
Generated from interconnection queue and public data sources
State
CA
County
Kings
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
—
Point of Interconnection
LOS BANOS-MIDWAY #2
Data Source
LBNL
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.