Brown Bear (CAISO-54696) — Project Summary

Queue ID
CAISO-54696
Capacity
304.425131 MW
Technology
Solar+Battery
Status
active
Location
Kings, CA
Region
CAISO
Developer
IA Status
Not Started

Brown Bear

CAISO-54696BetaActiveSolarBatteryCAISOLBNL

304.425 MW hybrid in Kings, CA · In queue since April 2023 · Proposed COD March 2029

304.425 MW

Capacity

3

Components

Solar + Battery + Solar+Battery

3y 1m

In Queue

Not Started

IA Status

COD target: 2029

Interconnection

Total Duration

5y 11m

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-03-30

Technology
Solar300.741 MW · 99%
Battery1.4 MW · 0%
Solar+Battery2.284 MW · 1%
About

The Brown Bear project is a proposed 304.43 MW hybrid solar and battery energy storage development in Kings County, California. The project consists of 300.74 MW of solar, 1.4 MW of battery storage, and 2.28 MW of co-located solar and battery capacity. It is located within the California Independent System Operator (CAISO) region and is interconnected with Pacific Gas & Electric (PGAE) at the LOS BANOS-MIDWAY #2 point of interconnection.

The project, identified as CAISO-54696 in the CAISO interconnection queue, entered the queue on April 17, 2023, with a proposed commercial operation date of March 30, 2029. As of the current data, an Interconnection Agreement (IA) has not been started for the Brown Bear project.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Kings

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

PGAE

Entity

CAISO

Service Type

Point of Interconnection

LOS BANOS-MIDWAY #2

Data Source

LBNL

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.