Gosford Solar Storage (CAISO-54702) — Project Summary

Queue ID
CAISO-54702
Capacity
304.401935 MW
Technology
Solar+Battery
Status
active
Location
Kern, CA
Region
CAISO
Developer
IA Status
Not Started

Gosford Solar Storage

CAISO-54702BetaActiveSolarBatteryCAISOLBNL

304.402 MW hybrid in Kern, CA · In queue since April 2023 · Proposed COD March 2029

304.402 MW

Capacity

2

Components

Solar + Battery

3y 1m

In Queue

Not Started

IA Status

COD target: 2029

Interconnection

Total Duration

5y 11m

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-03-30

Technology
Solar302.108 MW · 99%
Battery2.294 MW · 1%
About

The Gosford Solar Storage project is a proposed 304.4 MW hybrid solar and battery energy storage development in Kern County, California. The project, consisting of 302.11 MW of solar capacity and 2.29 MW of battery storage, is located within the CAISO region and is being proposed to Pacific Gas & Electric (PGAE).

The project is listed in the CAISO interconnection queue as entry CAISO-54702, with a queue entry date of April 17, 2023. The proposed commercial operation date is March 30, 2029. As of the latest data, the interconnection agreement (IA) status is "Not Started". The point of interconnection (POI) is MIDWAY-WHEELER RIDGE #1.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Kern

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

PGAE

Entity

CAISO

Service Type

Point of Interconnection

MIDWAY-WHEELER RIDGE #1

Data Source

LBNL

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Gosford Solar Storage