MidBishop
309.201 MW hybrid in Kings, CA · In queue since April 2023 · Proposed COD March 2029
309.201 MW
Capacity
3
Components
Solar + Battery + Solar+Battery
3y 1m
In Queue
Not Started
IA Status
COD target: 2029
Total Duration
5y 11m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-03-30
MidBishop is a proposed hybrid Solar+Battery project located in Kings County, California. The development project has a total capacity of 309.2 MW, consisting of 305.5 MW of solar, 1.4 MW of battery storage, and 2.3 MW of co-located Solar+Battery. The project is in the CAISO interconnection queue as entry CAISO-54704, with a queue entry date of April 17, 2023, and a proposed commercial operation date of March 30, 2029.
The interconnection utility is PG&E, and the point of interconnection is the Los Banos-Midway #2 substation. As of the latest data, the interconnection agreement has not yet been started. The project is currently listed as active in the CAISO queue.
Generated from interconnection queue and public data sources
State
CA
County
Kings
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
—
Point of Interconnection
LOS BANOS-MIDWAY #2
Data Source
LBNL
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about MidBishop