Torbino Energy Storage (CAISO-54707) — Project Summary

Queue ID
CAISO-54707
Capacity
454.569993 MW
Technology
Solar
Status
active
Location
Kern, CA
Region
CAISO
Developer
IA Status
Not Started

Torbino Energy Storage

CAISO-54707BetaActiveSolarCAISOLBNL

454.57 MW generation in Kern, CA · In queue since April 2023 · Proposed COD March 2029

454.57 MW

Capacity

1

Components

Solar

3y 1m

In Queue

Not Started

IA Status

COD target: 2029

Interconnection

Total Duration

5y 11m

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-03-30

About

The Torbino Energy Storage project is a proposed solar generation facility with a total capacity of 454.57 MW. The development is located in Kern County, California, and is interconnected to Southern California Edison (SCE) within the California Independent System Operator (CAISO) region.

The project, identified as CAISO-54707 in the interconnection queue, entered the queue on April 17, 2023, with a proposed commercial operation date of March 30, 2029. As of the latest data, the interconnection agreement (IA) status is "Not Started". The point of interconnection (POI) is the WINDHUB 500 kV substation. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Kern

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

SCE

Entity

CAISO

Service Type

Point of Interconnection

WINDHUB 500 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
ALTA6B2_7_N003
POI Substation
Windhub Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.