Torbino Energy Storage
454.57 MW generation in Kern, CA · In queue since April 2023 · Proposed COD March 2029
454.57 MW
Capacity
1
Components
Solar
3y 1m
In Queue
Not Started
IA Status
COD target: 2029
Total Duration
5y 11m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-03-30
The Torbino Energy Storage project is a proposed solar generation facility with a total capacity of 454.57 MW. The development is located in Kern County, California, and is interconnected to Southern California Edison (SCE) within the California Independent System Operator (CAISO) region.
The project, identified as CAISO-54707 in the interconnection queue, entered the queue on April 17, 2023, with a proposed commercial operation date of March 30, 2029. As of the latest data, the interconnection agreement (IA) status is "Not Started". The point of interconnection (POI) is the WINDHUB 500 kV substation. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
CA
County
Kern
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SCE
Entity
CAISO
Service Type
—
Point of Interconnection
WINDHUB 500 kV
Data Source
LBNL
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- ALTA6B2_7_N003
- POI Substation
- Windhub Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.