San Ysidro Energy Storage (CAISO-54711) — Project Summary

Queue ID
CAISO-54711
Capacity
156.042113 MW
Technology
Battery
Status
active
Location
Santa Clara, CA
Region
CAISO
Developer
IA Status
Not Started

San Ysidro Energy Storage

CAISO-54711BetaActiveBatteryCAISOLBNL

156.042 MW storage in Santa Clara, CA · In queue since April 2023 · Proposed COD June 2029

156.042 MW

Capacity

2

Components

Battery + Battery

3y 1m

In Queue

Not Started

IA Status

COD target: 2029

Interconnection

Total Duration

6y 2m

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-06-01

Technology
Battery2.742 MW · 2%
Battery153.3 MW · 98%
About

San Ysidro Energy Storage is a proposed 156.04 MW battery storage project located in Santa Clara County, California. The project consists of two battery components with capacities of 2.74 MW and 153.3 MW respectively. It is interconnected to the PG&E utility network at the LLAGAS 115 kV point of interconnection.

The project is listed in the CAISO interconnection queue as entry CAISO-54711, with a queue entry date of April 17, 2023, and a proposed commercial operation date of June 1, 2029. As of the latest data, the interconnection agreement has not yet been started. The San Ysidro Energy Storage project has been mentioned in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Santa Clara

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

PGAE

Entity

CAISO

Service Type

Point of Interconnection

LLAGAS 115 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.