Bantam Energy Storage (CAISO-54715) — Project Summary

Queue ID
CAISO-54715
Capacity
311.215801 MW
Technology
Battery
Status
active
Location
San Joaquin, CA
Region
CAISO
Developer
IA Status
Not Started

Bantam Energy Storage

CAISO-54715BetaActiveBatteryCAISOLBNL

311.216 MW storage in San Joaquin, CA · In queue since April 2023 · Proposed COD June 2029

311.216 MW

Capacity

2

Components

Battery + Battery

3y 1m

In Queue

Not Started

IA Status

COD target: 2029

Interconnection

Total Duration

6y 2m

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-06-01

Technology
Battery2.828 MW · 1%
Battery308.388 MW · 99%
About

The Bantam Energy Storage project is a proposed 311.22 MW battery storage project located in San Joaquin County, California. The project is in the CAISO interconnection queue as entry CAISO-54715, with a queue entry date of April 17, 2023. The proposed commercial operation date is June 1, 2029.

The project consists of two battery components with capacities of 2.83 MW and 308.39 MW. Interconnection service is being requested from Pacific Gas and Electric (PGAE) at the Eight Mile 230 kV point of interconnection. As of the current data, the interconnection agreement has not yet been started. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

San Joaquin

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

PGAE

Entity

CAISO

Service Type

Point of Interconnection

EIGHT MILE 230 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_NP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
EIGHTMI_2_N017
POI Substation
Eight Mile Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.