Spectrum Energy Storage 2 (CAISO-54720) — Project Summary

Queue ID
CAISO-54720
Capacity
565.94 MW
Technology
Battery
Status
active
Location
Madera, CA
Region
CAISO
Developer
IA Status
Not Started

Spectrum Energy Storage 2

CAISO-54720BetaActiveBatteryCAISOLBNL

565.94 MW storage in Madera, CA · In queue since April 2023 · Proposed COD March 2031

565.94 MW

Capacity

1

Components

Battery

3y 1m

In Queue

Not Started

IA Status

COD target: 2031

Interconnection

Total Duration

7y 11m

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2031-03-31

About

Spectrum Energy Storage 2 is a proposed battery storage project located in Madera County, California, with a total capacity of 565.94 MW. The project, which appeared in recent news, is being developed within the CAISO region and is interconnected with PG&E. It consists entirely of battery storage.

The project is listed in the CAISO interconnection queue as entry CAISO-54720, with a queue entry date of April 17, 2023. The proposed commercial operation date is March 31, 2031. As of the latest data, the interconnection agreement has not yet been started. The point of interconnection is the Q1881 Switching Station on Tesla-Newark #1 230kV.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Madera

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

PGAE

Entity

CAISO

Service Type

Point of Interconnection

Q1881 Switching Station on Tesla-Newark #1 230kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
REDWOOD_6_N005
POI Substation
Switching Station 1

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.