Bajada (CAISO-54761) — Project Summary

Queue ID
CAISO-54761
Capacity
707.1002 MW
Technology
Solar+Battery
Status
active
Location
Riverside, CA
Region
CAISO
Developer
IA Status
Not Started

Bajada

CAISO-54761BetaActiveSolarBatteryCAISOLBNL

707.1 MW hybrid in Riverside, CA · In queue since April 2023 · Proposed COD June 2030

707.1 MW

Capacity

2

Components

Solar + Battery

3y 1m

In Queue

Not Started

IA Status

COD target: 2030

Interconnection

Total Duration

7y 2m

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-06-01

Technology
Solar352.855 MW · 50%
Battery354.245 MW · 50%
About

The Bajada project is a proposed 707.1 MW hybrid solar and battery energy storage development in Riverside County, California. The project, located within the CAISO region and interconnected with Southern California Edison (SCE), consists of 352.85 MW of solar photovoltaic generation and 354.25 MW of battery energy storage.

The project is listed in the CAISO interconnection queue as entry CAISO-54761, with a queue entry date of April 17, 2023, and a proposed commercial operation date of June 1, 2030. As of the latest data, the interconnection agreement (IA) has not yet been started. The point of interconnection (POI) is the Red Bluff 230 kV substation. The Bajada project has been mentioned in recent industry news.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Riverside

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

SCE

Entity

CAISO

Service Type

Point of Interconnection

RED BLUFF 230 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
OBERON_7_N122
POI Substation
Red Bluff Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.