Bajada
707.1 MW hybrid in Riverside, CA · In queue since April 2023 · Proposed COD June 2030
707.1 MW
Capacity
2
Components
Solar + Battery
3y 1m
In Queue
Not Started
IA Status
COD target: 2030
Total Duration
7y 2m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-06-01
The Bajada project is a proposed 707.1 MW hybrid solar and battery energy storage development in Riverside County, California. The project, located within the CAISO region and interconnected with Southern California Edison (SCE), consists of 352.85 MW of solar photovoltaic generation and 354.25 MW of battery energy storage.
The project is listed in the CAISO interconnection queue as entry CAISO-54761, with a queue entry date of April 17, 2023, and a proposed commercial operation date of June 1, 2030. As of the latest data, the interconnection agreement (IA) has not yet been started. The point of interconnection (POI) is the Red Bluff 230 kV substation. The Bajada project has been mentioned in recent industry news.
Generated from interconnection queue and public data sources
State
CA
County
Riverside
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SCE
Entity
CAISO
Service Type
—
Point of Interconnection
RED BLUFF 230 kV
Data Source
LBNL
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- OBERON_7_N122
- POI Substation
- Red Bluff Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.