Goldlink
707.755 MW hybrid in Nye, NV · In queue since April 2023 · Proposed COD June 2030
707.755 MW
Capacity
2
Components
Solar + Battery
3y 1m
In Queue
Not Started
IA Status
COD target: 2030
Total Duration
7y 2m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-06-01
The Goldlink project is a proposed 707.75 MW hybrid solar and battery energy storage development in Nye County, Nevada. The project consists of a 353.98 MW solar array coupled with a 353.78 MW battery energy storage system.
The project is listed in the CAISO interconnection queue as entry CAISO-54768, with a queue entry date of April 17, 2023. The proposed commercial operation date is June 1, 2030. As of the current data, the interconnection agreement status is "Not Started". The point of interconnection is the LATHROP 230 kV (FUTURE) substation. The listed utility is GLW.
Generated from interconnection queue and public data sources
State
NV
County
Nye
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
GLW
Entity
CAISO
Service Type
—
Point of Interconnection
LATHROP 230 kV (FUTURE)
Data Source
LBNL
- ISO / RTO
- CAISO
- Trading Hub
- TH_NP15_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.