Superba Hybrid (CAISO-54770) — Project Summary

Queue ID
CAISO-54770
Capacity
411.029 MW
Technology
Solar+Battery
Status
active
Location
Fresno, CA
Region
CAISO
Developer
IA Status
Not Started

Superba Hybrid

CAISO-54770BetaActiveSolarBatteryCAISOLBNL

411.029 MW hybrid in Fresno, CA · In queue since April 2023 · Proposed COD September 2029

411.029 MW

Capacity

2

Components

Solar + Battery

3y 1m

In Queue

Not Started

IA Status

COD target: 2029

Interconnection

Total Duration

6y 5m

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-09-30

Technology
Solar205.625 MW · 50%
Battery205.404 MW · 50%
About

The Superba Hybrid project is a proposed solar and battery energy storage development with a total capacity of 411.03 MW. Located in Fresno County, California, the project consists of a 205.63 MW solar component and a 205.4 MW battery energy storage system. The project is located within the CAISO region and is being developed for interconnection with PG&E at the LOS BANOS-MIDWAY #2 point of interconnection.

The project entered the CAISO interconnection queue as queue ID CAISO-54770 on April 17, 2023, with a proposed commercial operation date of September 30, 2029. As of the latest data, the interconnection agreement has not yet been started. The project is currently listed as active in the interconnection queue.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Fresno

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

PGAE

Entity

CAISO

Service Type

Point of Interconnection

LOS BANOS-MIDWAY #2

Data Source

LBNL

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.