Superba Hybrid
411.029 MW hybrid in Fresno, CA · In queue since April 2023 · Proposed COD September 2029
411.029 MW
Capacity
2
Components
Solar + Battery
3y 1m
In Queue
Not Started
IA Status
COD target: 2029
Total Duration
6y 5m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-09-30
The Superba Hybrid project is a proposed solar and battery energy storage development with a total capacity of 411.03 MW. Located in Fresno County, California, the project consists of a 205.63 MW solar component and a 205.4 MW battery energy storage system. The project is located within the CAISO region and is being developed for interconnection with PG&E at the LOS BANOS-MIDWAY #2 point of interconnection.
The project entered the CAISO interconnection queue as queue ID CAISO-54770 on April 17, 2023, with a proposed commercial operation date of September 30, 2029. As of the latest data, the interconnection agreement has not yet been started. The project is currently listed as active in the interconnection queue.
Generated from interconnection queue and public data sources
State
CA
County
Fresno
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
—
Point of Interconnection
LOS BANOS-MIDWAY #2
Data Source
LBNL
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.