Cantus
499.048 MW hybrid in Merced, CA · In queue since April 2023 · Proposed COD March 2031
499.048 MW
Capacity
2
Components
Solar + Battery
3y 1m
In Queue
Not Started
IA Status
COD target: 2031
Total Duration
7y 11m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2031-03-14
The Cantus project is a proposed 499.05 MW hybrid solar and battery energy storage development in Merced County, California. The project, located within the CAISO region, consists of 249.52 MW of solar generation and 249.52 MW of battery storage. The project is listed in the CAISO interconnection queue as entry CAISO-54771, with a queue entry date of April 17, 2023, and a proposed commercial operation date of March 14, 2031. The interconnection agreement (IA) status is listed as "Not Started".
The proposed point of interconnection (POI) for the Cantus project is the FINK SW STA 230 kV substation. The project is listed as being within the utility territory of PG&E. The developer is not specified in the provided data.
Generated from interconnection queue and public data sources
State
CA
County
Merced
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
—
Point of Interconnection
FINK SW STA 230 kV
Data Source
LBNL
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.