Township Power Bank Expansion (CAISO-54783) — Project Summary

Queue ID
CAISO-54783
Capacity
22.6 MW
Technology
Battery
Status
active
Location
Sutter, CA
Region
CAISO
Developer
IA Status
Not Started

Township Power Bank Expansion

CAISO-54783BetaActiveGasBatteryCAISOLBNL

22.6 MW hybrid in Sutter, CA · In queue since April 2023 · Proposed COD June 2028

22.6 MW

Capacity

2

Components

Gas + Battery

3y 1m

In Queue

Not Started

IA Status

COD target: 2028

Interconnection

Total Duration

5y 2m

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-06-01

Technology
Gas11.3 MW · 50%
Battery11.3 MW · 50%
About

Township Power Bank Expansion is a proposed hybrid development project located in Sutter County, California, within the CAISO region. The project, with a total capacity of 22.6 MW, consists of an 11.3 MW gas component and an 11.3 MW battery component.

The project is listed in the CAISO interconnection queue under queue ID CAISO-54783, with an entry date of April 17, 2023. The proposed commercial operation date is June 1, 2028. As of the latest data, the interconnection agreement status is "Not Started". The point of interconnection is GREENLEAF #1 TAP.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Sutter

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

PGAE

Entity

CAISO

Service Type

Point of Interconnection

GREENLEAF #1 TAP

Data Source

LBNL

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Township Power Bank Expansion