Township Power Bank Expansion
22.6 MW hybrid in Sutter, CA · In queue since April 2023 · Proposed COD June 2028
22.6 MW
Capacity
2
Components
Gas + Battery
3y 1m
In Queue
Not Started
IA Status
COD target: 2028
Total Duration
5y 2m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-06-01
Township Power Bank Expansion is a proposed hybrid development project located in Sutter County, California, within the CAISO region. The project, with a total capacity of 22.6 MW, consists of an 11.3 MW gas component and an 11.3 MW battery component.
The project is listed in the CAISO interconnection queue under queue ID CAISO-54783, with an entry date of April 17, 2023. The proposed commercial operation date is June 1, 2028. As of the latest data, the interconnection agreement status is "Not Started". The point of interconnection is GREENLEAF #1 TAP.
Generated from interconnection queue and public data sources
State
CA
County
Sutter
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
—
Point of Interconnection
GREENLEAF #1 TAP
Data Source
LBNL
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.