Baylands Power Bank (CAISO-54785) — Project Summary

Queue ID
CAISO-54785
Capacity
307.62 MW
Technology
Battery
Status
active
Location
Santa Clara, CA
Region
CAISO
Developer
IA Status
Not Started

Baylands Power Bank

CAISO-54785BetaActiveBatteryCAISOLBNL

307.62 MW storage in Santa Clara, CA · In queue since April 2023 · Proposed COD June 2029

307.62 MW

Capacity

1

Components

Battery

3y 1m

In Queue

Not Started

IA Status

COD target: 2029

Interconnection

Total Duration

6y 2m

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-06-01

About

The Baylands Power Bank is a proposed 307.62 MW battery storage project located in Santa Clara County, California. The project is being developed within the California Independent System Operator (CAISO) region and is interconnected to the PG&E utility grid at the LOS ESTEROS 115 kV point of interconnection.

The project, identified as CAISO-54785 in the interconnection queue, entered the queue on April 17, 2023, with a proposed commercial operation date of June 1, 2029. As of the current data, the interconnection agreement (IA) has not yet been started. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Santa Clara

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

PGAE

Entity

CAISO

Service Type

Point of Interconnection

LOS ESTEROS 115 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
LECEFGT2_7_B1
POI Substation
Los Esteros Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Baylands Power Bank