Baylands Power Bank
307.62 MW storage in Santa Clara, CA · In queue since April 2023 · Proposed COD June 2029
307.62 MW
Capacity
1
Components
Battery
3y 1m
In Queue
Not Started
IA Status
COD target: 2029
Total Duration
6y 2m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-06-01
The Baylands Power Bank is a proposed 307.62 MW battery storage project located in Santa Clara County, California. The project is being developed within the California Independent System Operator (CAISO) region and is interconnected to the PG&E utility grid at the LOS ESTEROS 115 kV point of interconnection.
The project, identified as CAISO-54785 in the interconnection queue, entered the queue on April 17, 2023, with a proposed commercial operation date of June 1, 2029. As of the current data, the interconnection agreement (IA) has not yet been started. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
CA
County
Santa Clara
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
—
Point of Interconnection
LOS ESTEROS 115 kV
Data Source
LBNL
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- LECEFGT2_7_B1
- POI Substation
- Los Esteros Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Baylands Power Bank