Bryon Highway Power Bank
1,159.793 MW hybrid in Alameda, CA · In queue since April 2023 · Proposed COD January 2031
1,159.793 MW
Capacity
2
Components
Gas + Battery
3y 1m
In Queue
Not Started
IA Status
COD target: 2031
Total Duration
7y 9m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2031-01-01
The Bryon Highway Power Bank is a proposed hybrid project located in Alameda County, California, within the CAISO region. The project, which has appeared in recent news coverage, combines 662.27 MW of gas generation with 497.52 MW of battery storage, for a total capacity of 1159.79 MW.
The project entered the CAISO interconnection queue as CAISO-54788 on April 17, 2023, with a proposed commercial operation date of January 1, 2031. Its interconnection agreement status is listed as "Not Started." The point of interconnection is the TESLA 230 kV substation.
Generated from interconnection queue and public data sources
State
CA
County
Alameda
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
—
Point of Interconnection
TESLA 230 kV
Data Source
LBNL
- ISO / RTO
- CAISO
- Trading Hub
- TH_NP15_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- TESLA_1_B1
- POI Substation
- Tesla Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Bryon Highway Power Bank