Bryon Highway Power Bank (CAISO-54788) — Project Summary

Queue ID
CAISO-54788
Capacity
1159.793 MW
Technology
Battery
Status
active
Location
Alameda, CA
Region
CAISO
Developer
IA Status
Not Started

Bryon Highway Power Bank

CAISO-54788BetaActiveGasBatteryCAISOLBNL

1,159.793 MW hybrid in Alameda, CA · In queue since April 2023 · Proposed COD January 2031

1,159.793 MW

Capacity

2

Components

Gas + Battery

3y 1m

In Queue

Not Started

IA Status

COD target: 2031

Interconnection

Total Duration

7y 9m

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2031-01-01

Technology
Gas662.27 MW · 57%
Battery497.523 MW · 43%
About

The Bryon Highway Power Bank is a proposed hybrid project located in Alameda County, California, within the CAISO region. The project, which has appeared in recent news coverage, combines 662.27 MW of gas generation with 497.52 MW of battery storage, for a total capacity of 1159.79 MW.

The project entered the CAISO interconnection queue as CAISO-54788 on April 17, 2023, with a proposed commercial operation date of January 1, 2031. Its interconnection agreement status is listed as "Not Started." The point of interconnection is the TESLA 230 kV substation.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Alameda

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

PGAE

Entity

CAISO

Service Type

Point of Interconnection

TESLA 230 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_NP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
TESLA_1_B1
POI Substation
Tesla Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Bryon Highway Power Bank