PATTON SOLAR (CAISO-54795) — Project Summary

Queue ID
CAISO-54795
Capacity
640 MW
Technology
Solar+Battery
Status
active
Location
Riverside, CA
Region
CAISO
Developer
IA Status
Not Started

PATTON SOLAR

CAISO-54795BetaActiveSolarBatteryCAISOLBNL

640 MW hybrid in Riverside, CA · In queue since April 2023 · Proposed COD June 2029

640 MW

Capacity

2

Components

Solar + Battery

3y 1m

In Queue

Not Started

IA Status

COD target: 2029

Interconnection

Total Duration

6y 2m

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-06-01

Technology
Solar240 MW · 38%
Battery400 MW · 63%
About

The Patton Solar project is a proposed 640 MW hybrid solar and battery energy storage project in Riverside County, California. The development project consists of a 240 MW solar array coupled with a 400 MW battery energy storage system.

The project, assigned queue ID CAISO-54795, is currently active in the CAISO interconnection queue with a queue entry date of April 17, 2023. The proposed commercial operation date is June 1, 2029. Interconnection service will be provided by Southern California Edison (SCE) at the Julian Hinds 230 kV point of interconnection. As of the latest data, the Interconnection Agreement (IA) has not yet been started.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Riverside

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

SCE

Entity

CAISO

Service Type

Point of Interconnection

JULIAN HINDS 230 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.