Kama 3 FPV
127.16 MW hybrid in Kings, CA · In queue since April 2023 · Proposed COD January 2026
127.16 MW
Capacity
2
Components
Solar + Battery
3y 1m
In Queue
Not Started
IA Status
COD target: 2026
Total Duration
2y 9m
Schedule
4 months past proposed COD
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-01-01
The Kama 3 FPV project is a proposed 127.16 MW hybrid solar and battery energy storage project located in Kings County, California. The development project, consisting of 86.83 MW of solar generation and 40.33 MW of battery storage, is being proposed within the California Independent System Operator (CAISO) region.
The project, identified by queue ID CAISO-54813, entered the CAISO interconnection queue on April 17, 2023, with a proposed commercial operation date of January 1, 2026. The point of interconnection is at the WAUKENA SW STA 115 kV substation, and the interconnection agreement status is listed as "Not Started". Recent news coverage has discussed the project.
Generated from interconnection queue and public data sources
State
CA
County
Kings
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
—
Point of Interconnection
WAUKENA SW STA 115 kV
Data Source
LBNL
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.