Cavalcade Storage (CAISO-54835) — Project Summary

Queue ID
CAISO-54835
Capacity
198.4 MW
Technology
Battery
Status
active
Location
Fresno, CA
Region
CAISO
Developer
IA Status
Not Started

Cavalcade Storage

CAISO-54835BetaActiveBatteryCAISOLBNL

198.4 MW storage in Fresno, CA · In queue since April 2023 · Proposed COD March 2031

198.4 MW

Capacity

1

Components

Battery

3y 1m

In Queue

Not Started

IA Status

COD target: 2031

Interconnection

Total Duration

7y 11m

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2031-03-01

About

Cavalcade Storage is a proposed 198.4 MW battery storage project located in Fresno County, California. The project is in the California Independent System Operator (CAISO) interconnection queue as entry CAISO-54835, with a queue entry date of April 17, 2023. The proposed commercial operation date is March 1, 2031.

The project's interconnection agreement (IA) status is "Not Started". The designated point of interconnection (POI) is the Los Banos-Gates #1 substation. Pacific Gas and Electric (PGAE) is the utility associated with the project. The developer is not specified in the available data. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Fresno

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

PGAE

Entity

CAISO

Service Type

Point of Interconnection

LOS BANOS-GATES #1

Data Source

LBNL

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Cavalcade Storage