Cavalcade Storage
198.4 MW storage in Fresno, CA · In queue since April 2023 · Proposed COD March 2031
198.4 MW
Capacity
1
Components
Battery
3y 1m
In Queue
Not Started
IA Status
COD target: 2031
Total Duration
7y 11m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2031-03-01
Cavalcade Storage is a proposed 198.4 MW battery storage project located in Fresno County, California. The project is in the California Independent System Operator (CAISO) interconnection queue as entry CAISO-54835, with a queue entry date of April 17, 2023. The proposed commercial operation date is March 1, 2031.
The project's interconnection agreement (IA) status is "Not Started". The designated point of interconnection (POI) is the Los Banos-Gates #1 substation. Pacific Gas and Electric (PGAE) is the utility associated with the project. The developer is not specified in the available data. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
CA
County
Fresno
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
—
Point of Interconnection
LOS BANOS-GATES #1
Data Source
LBNL
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Cavalcade Storage