Stuart Mesa Solar
56 MW generation in San Diego, CA · In queue since April 2023 · Proposed COD July 2028
56 MW
Capacity
1
Components
Solar
3y 1m
In Queue
Not Started
IA Status
COD target: 2028
Total Duration
5y 3m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-07-01
The Stuart Mesa Solar project is a proposed 56 MW solar generation project located in San Diego County, California. The project is in the CAISO interconnection queue as entry CAISO-54852, with a queue entry date of April 17, 2023. The proposed commercial operation date is July 1, 2028.
The project's interconnection agreement (IA) status is listed as "Not Started." The designated point of interconnection (POI) is 697 (Oceanside - San Luis Rey), and the interconnecting utility is SDGE. The project is currently listed as "active" in the interconnection queue.
Generated from interconnection queue and public data sources
State
CA
County
San Diego
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SDGE
Entity
CAISO
Service Type
—
Point of Interconnection
697 (Oceanside - San Luis Rey)
Data Source
LBNL
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- SANLUSRY_6_N013
- POI Substation
- San Luis 5
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.