Tioga Pass (CAISO-54879) — Project Summary

Queue ID
CAISO-54879
Capacity
103.000001 MW
Technology
Battery
Status
active
Location
San Joaquin, CA
Region
CAISO
Developer
IA Status
Not Started

Tioga Pass

CAISO-54879BetaActiveBatteryCAISOLBNL

103 MW storage in San Joaquin, CA · In queue since April 2023 · Proposed COD January 2028

103 MW

Capacity

1

Components

Battery

3y 1m

In Queue

Not Started

IA Status

COD target: 2028

Interconnection

Total Duration

4y 9m

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-01-31

About

The Tioga Pass project is a proposed 103 MW battery storage project located in San Joaquin County, California. Interconnection is requested through the CAISO queue, with queue ID CAISO-54879, and Pacific Gas & Electric (PGAE) is the utility. The project entered the queue on April 17, 2023, with a proposed commercial operation date of January 31, 2028. As of the current data, the interconnection agreement has not yet been started.

The development project consists solely of battery storage, with a total capacity of 103 MW. The point of interconnection (POI) is the Lockeford 115 kV substation. The project is currently listed as active within the CAISO interconnection queue.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

San Joaquin

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

PGAE

Entity

CAISO

Service Type

Point of Interconnection

LOCKEFORD 115 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_NP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
LOCKFORD_7_N001
POI Substation
Lockeford Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.