ONNI Solar
207.484 MW hybrid in Los Angeles, CA · In queue since April 2023 · Proposed COD December 2027
207.484 MW
Capacity
2
Components
Solar + Battery
3y 1m
In Queue
Not Started
IA Status
COD target: 2027
Total Duration
4y 8m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-12-01
ONNI Solar is a proposed 207.48 MW hybrid solar and battery energy storage project in Los Angeles County, California. The development project, consisting of 103.76 MW of solar and 103.73 MW of battery storage, is located within the California Independent System Operator (CAISO) region and interconnects with Southern California Edison (SCE). The project entered the CAISO queue as queue ID CAISO-54890 on April 17, 2023, with a proposed commercial operation date of December 1, 2027. As of the latest data, the interconnection agreement has not yet been started.
The proposed project has been the subject of recent news coverage related to the energy industry.
Generated from interconnection queue and public data sources
State
CA
County
Los Angeles
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SCE
Entity
CAISO
Service Type
—
Point of Interconnection
WHIRLWIND 230 kV
Data Source
LBNL
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- ASTORIA2_7_N001
- POI Substation
- Whirlwind Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about ONNI Solar