Mackerel Energy (CAISO-54892) — Project Summary

Queue ID
CAISO-54892
Capacity
151.85 MW
Technology
Solar+Battery
Status
active
Location
Imperial, CA
Region
CAISO
Developer
IA Status
Not Started

Mackerel Energy

CAISO-54892BetaActiveSolarBatteryCAISOLBNL

151.85 MW hybrid in Imperial, CA · In queue since April 2023 · Proposed COD July 2029

151.85 MW

Capacity

2

Components

Solar + Battery

3y 1m

In Queue

Not Started

IA Status

COD target: 2029

Interconnection

Total Duration

6y 3m

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-07-31

Technology
Solar101.61 MW · 67%
Battery50.24 MW · 33%
About

Mackerel Energy is a proposed 151.85 MW hybrid solar and battery project located in Imperial County, California. The development project consists of a 101.61 MW solar array coupled with a 50.24 MW battery energy storage system. It is listed in the CAISO interconnection queue under queue ID CAISO-54892.

The project, which is connected to the SDGE utility, entered the CAISO queue on April 17, 2023, with a proposed commercial operation date of July 31, 2029. As of the latest data, the interconnection agreement (IA) status is "Not Started". The point of interconnection (POI) is the IMPERIAL VALLEY 230 kV substation.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Imperial

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

SDGE

Entity

CAISO

Service Type

Point of Interconnection

IMPERIAL VALLEY 230 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
WESCAN_7_N002
POI Substation
Imperial Valley Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Mackerel Energy